The interaction of design and human capabilities |
|
|
|
|
|
Account drawn from Danaher (1980) |
|
Diverted from approach to Miami Int'l Airport
due to light indicating a
malfunction in nose landing gear light. |
|
Set autopilot to 2000 feet to reduce work load
while checking nose landing gear. |
|
Autopilot was inadvertently switched off by
pilot, leading to a gradual descent. |
|
Crew did not notice descent |
|
|
|
|
|
ATC saw plane reading at 900 feet. The current system could report errors
for up to three sweeps. |
|
The controller did contact plane but was told
all OK. |
|
Controllers attention was diverted by 5 other
planes he was responsible for |
|
30 seconds later place crashed killing 99 out of
176. |
|
|
|
|
|
Pilot Error: not watching altitude which is
pilots responsibility |
|
Pilot assumed autopilot worked. |
|
Controller Error: did not report low altitude to
the pilot |
|
(They
are required to now). |
|
Name all the factors that contributed to this
crash? |
|
|
|
|
|
DEFINITION:
an action or lack of action that violates some tolerance limit(s) of
the system. |
|
Thus defined in terms of system requirements and
capabilities. |
|
The the occurrence of an error does not imply
anything about human, even if it is the persons fault. |
|
It could be a system flaw |
|
|
|
|
red blue yellow green |
|
yellow green yellow red |
|
blue red green blue |
|
yellow yellow blue green |
|
green red red yellow |
|
blue blue green red |
|
red green blue yellow |
|
|
|
|
|
|
|
Error Probability (EP) also known as Human Error
Probability (HEP): |
|
EP = (# of errors)/(total # of opportunities for
the error) |
|
value between 0 and 1 |
|
gives rate of errors |
|
this is a probabilistic value |
|
it does not indicate if an error will or will
not occur |
|
just the likelihood |
|
does not indicate type or cause of error |
|
|
|
|
|
|
DEFINITION:
Probability of a successful outcome of the system or component. |
|
Reliability is also defined in terms of system
requirements. |
|
Thus, to evaluate a system it is necessary to
know the goals and purposes of the system. |
|
Reliability is a probabilistic term. |
|
Never seen the perfect system. |
|
Calculation of Reliability |
|
R = (# of successful operations)/(total # of
operations) |
|
R = 1 - EP |
|
|
|
|
|
Basic Error Types |
|
Unintentional vs. Intentional |
|
e.g. mistake on a test vs. what speeds most of
us drive. |
|
Unrecovered vs. Recovered |
|
Recovered:
Error with possibility for damage but no damage actually occurred.
(Driving home drunk safely). |
|
Unrecovered:
Error where damage could not be avoided. |
|
The recovered error of one day could be the next
day's unrecovered error. |
|
|
|
|
|
|
Swain and Guttmans (1980) Human Error
Categories. |
|
Error of Omission |
|
tpographicl errrs |
|
Error of Commission |
|
Hitting thumb with the hammer |
|
Extraneous Act |
|
reading a different class's assignment in class |
|
Sequential Error |
|
My usual: light the fire before opening the
damper |
|
Time Error |
|
running a red light |
|
|
|
|
|
|
Meisters (1971) Types of Failures |
|
Based on where the error originates. |
|
Operating error: |
|
System is not operated according to intended
procedure. |
|
Design Error: |
|
Designer does not take into account human
abilities. |
|
Manufacturing Error: |
|
System is not built according to design. |
|
Installation and Maintenance Errors |
|
System is not installed or maintained correctly. |
|
Scary how common these are. |
|
|
|
|
|
|
Another Cognitively Based System - Slips vs.
Mistakes by Reason and Navon |
|
Slips are errors in execution |
|
Mistakes are errors in planning an action |
|
Lawrences (1974) Model with Relative Frequency |
|
Failure to perceive a hazard 36% |
|
Underestimate a hazard 25% |
|
Failure to respond 17% |
|
Ineffective response 14 |
|
Importance: Different types of errors need
different types of actions to prevent. |
|
|
|
|
Variable Error:
errors that differ from trial to trial. |
|
Constant Error: errors that are constant from
trial to trial. |
|
Figure - after Champanis (1951) |
|
Constant are easier to predict and thus correct. |
|
|
|
|
A Brief Overview |
|
Some Steps that are part of a complete analysis
(Swain & Guttman, 1980) |
|
1. Describe system goals and
functions. |
|
2. Describe situation. |
|
3. Describe tasks and jobs. |
|
4. Analyze tasks for where errors are
likely. |
|
5. Estimate probability of each
error. |
|
6. Estimate probability error is not
corrected. |
|
7. Devise means to increase
reliability. |
|
8. Repeat steps 4 - 7in light of
changes. |
|
|
|
|
|
There are several techniques, will discuss THERP
(Swain, 1963) |
|
Start at top with probability of
correct/incorrect action. |
|
Next act is probability of given the last
action. |
|
These are conditional probabilities - They are
not independent. |
|
Sum of partial error probabilities at bottom is
overall error probability. |
|
|
|
|
|
THERP (Cont.) |
|
In the diagram, a capital letter is a correct
outcome and a small letter is an erroneous action. |
|
The | symbol indicates a conditional
probability. |
|
Apply to starting a car. |
|
K = correct key |
|
k = incorrect key |
|
S = getting key into ignition |
|
s = missing ignition |
|
P(S|K) is probability of getting key into
ignition, given getting correct key. This is the only correct outcome. |
|
P(error) = 1-P(S|K) |
|
|
|
|
|
To get probabilities of specific actions, it is
common to used tabled values. |
|
Example HEPs (Swain and Guttman, 1980) |
|
Select wrong control in a group .003 |
|
of labeled identical controls |
|
Turn control wrong direction .5 |
|
under stress when design |
|
violates population norm. |
|
Failure to recognize an incorrect .01 |
|
status of item in front of operator |
|
|
|
|
|
In general reliability goes down as number of
components goes up (i.e. as complexity goes up). |
|
Components in a Series |
|
In a series if any single component fails the
whole system fails - the four tires on the car. |
|
Rs = R1 * R2 * ... * Rn |
|
Examples: All components have reliability of
0.90. |
|
n = 1 | Rs = = .90 |
|
n = 2 | Rs = .9*.9 = .81 |
|
n = 3 | Rs = .9*.9*.9 = .73 |
|
n = 10 | Rs = .910 =
.35 |
|
|
|
|
|
Active Redundancy: Both components operate all
the time but only one is needed. |
|
Failure occurs only when both fail or
(EP1)*(EP2) |
|
Thus reliability is:RS = 1 - P(1-RI) |
|
|
|
Example: Use two components and both components
have a reliability of 0.90. |
|
In a series| Rs = .9*.9 = .81
(above) |
|
Redundant| Rs = 1-(1-.9)2 = .99 |
|
Two redundant components in a series| |
|
Rs = .99*.99 = .98 |
|
|
|
|
|
|
HARDWARE |
|
KISS (Keep It Simple Stupid). |
|
A-10 ~33% unavailable at any one time. |
|
F-111D ~66% unavailable |
|
Apache Helicopter is similar record to F-111D |
|
Make it reliable/Quality Control |
|
HUMAN |
|
Use human factors knowledge in design - back to
Three-Mile Island. |
|
Use human as redundant system. |
|
Others? |
|
|
|
|
|
|
DEFINITION: An estimation of the consequences
associated with particular errors. |
|
Includes estimate of probability |
|
i.e., risk = p(error)*consequences(error) |
|
Can be any sort of risk |
|
e.g., loss of life, money, etc. |
|
Must estimate significance of these various
consequences |
|
Used to assist many types of decisions: |
|
Estimates of safety |
|
Estimates of probable success |
|
Types of training to use to help operators not
to miss important errors |
|