 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
u |
Active
Redundancy: Both components operate all the
|
|
time but
only one is needed.
|
|
|
u |
Failure
occurs only when both fail or (EP1)*(EP2)
|
|
|
u |
Thus reliability is:RS = 1 - P(1-RI)
|
|
|
|
|
|
Example:
Use two components and both
|
|
|
components
have a reliability of 0.90.
|
|
|
|
In a
series| Rs = .9*.9 = .81
|
|
|
(above)
|
|
|
|
Redundant| Rs = 1-(1-.9)2 =
.99
|
|
|
|
Two
redundant components in a series|
|
|
|
|
Rs = .99*.99 = .98
|
|